Benefits of settlement

  • Industry location secured as institutional confirmed
  • Flexible shift work possible
  • Excellent traffic navigation system
  • The area can be taken over with wide and finally confirmed driving lanes
  • Ready equipped (installed) production halls
  • 500 parking places
  • Size - and class-variable clean rooms
  • 20 KV ring net supply
  • All industrial electrical voltage level with high power available
  • High performance water supply
  • Central burglary and fire protection system
  • 24 hour security service
  • Central telephone system
  • Latest IT-system
  • High market potential in daily distance
  • Famous research and development - equipment in the neighbourhood
  • Excellent skilled and trained staff
  • Central facility management
  • Entire area is video controlled
  • Detailed property estimate
  • 70.000 square meters, all real estates with final confirmation of construction plans
  • Fully equipped furnished canteen with separate entrance to business area
  • Electrical power up to 10MW
  • Water supply up to 2.000 m3/ a day
  • Central heating system
  • High-output gas supply
  • Using and handling of gas and acid
  • Various possibilities of confirmation for water supply regulations